Time: 2022-09-22 17:23:12
The EBZ230M-2H intelligent bolter is used for intelligent excavation in the mine. The mine covers an area of 20.65 square kilometers and has a designed mine production capacity of 1.2 million tons per year. Demonstration···
Time: 2022-09-08 14:47:38
With the increase of international oil price, oil exploitation has gradually become one of the major tasks of all countries.The United States is one of the countries with the largest proven oil reserves and oil consumer ···
Time: 2022-08-25 13:20:26
Recently, one unit HELI 5 ton forkliftCPCD50wasdelivered to client by sea.Product featureThe full suspension shock absorption design and the optimized design of the vibration transmission of the power system reduce the v···
Time: 2022-08-24 15:42:29
crane XCT90L7 uses a single-cylinder latch system, seven-section 68m main boom, and two-section 17.5m truss-type jib.
Time: 2022-08-19 13:54:31
XCT12L5_1 adopts anti-torsion octagonal 37.5m main boom five-section boom double-cylinder rope row structure, which has stronger lifting capacity.With 1.7t counterweight, the ability to lift farther is stronger. 32.3m hi···
Time: 2022-08-16 15:15:00
The main boom of QY50K5D-2 is 45.5m, the jib is 16m, and the maximum boom length is 61.5m. The performance of the medium and long boom in high frequency conditions comprehensively surpasses the products of the same level···
Time: 2022-08-11 13:20:18
Recently, two units wheel loader LW600KN with timber tongs were delivered to client by container.
Time: 2022-08-09 16:06:53
XE800D is equipped with a 5.2m³ rock bucket as standard, which is mainly used for coal seam roof blasting and material digging and loading operations. Digging 426m³ per hour, the fuel consumption per unit is 0.137L/m³, t···
Time: 2022-08-03 13:36:20
In the Midland oilfield in Texas, USA, two XE360Us are working in rock excavation.The Midland oilfield is located in a desert area, and the hot and dry climate is often accompanied by wind and sand. The resulting weather···
Time: 2022-08-02 14:18:01
The XGC400-I crawler crane operates at Lekki Port, one of the largest deepwater ports in Nigeria.Nigerian President Buhari said in a statement issued on July 2, "The operation of Lekki Port will create a large numbe···