The Lhasa River Mouth Bridge Project is a major project led by the Sarawak State Government of Malaysia and is the longest bridge in Sarawak.
The climate in Sarawak is hot and humid throughout the year, the rainy season is long, and the pouring operation is generally as short as a few hours or as long as several days. This undoubtedly brings great challenges to the equipment construction.
In order to cope with harsh weather conditions, HBT9018V has made customized improvements in heat dissipation, heat resistance, waterproofing, moisture resistance, etc., to ensure that the equipment can work for a long time in a high humidity and high heat environment.
The narrow pouring platform can not only accommodate two XCMG HBT9018V trailer pumps at the same time, but also will not affect the passage of other transportation vehicles. While reducing safety risks, it also improves construction efficiency. HBT9018V is equipped with a number of world-leading "black technologies", such as efficient skirt valve pumping system, reliable hydraulic reversing technology, ultra-low pressure loss hydraulic system technology, etc., making it "small and powerful"!