The XGC400-I crawler crane operates at Lekki Port, one of the largest deepwater ports in Nigeria.
Nigerian President Buhari said in a statement issued on July 2, "The operation of Lekki Port will create a large number of employment opportunities, improve the lives of Nigerians, and at the same time promote Nigeria's foreign trade activities, help Nigeria improve its business environment and attract foreign countries. invest.
XGC400-I was specially purchased by the owner for the dry Lekki port project, and it is the largest crane in this project. In the 8 months I've been driving the XGC400-I, its handling, fretting have been on the line, and I'm thrilled and satisfied with its performance!
Maneuverability of XGC400-I: The flexible and efficient super-lifting stepless luffing system makes it possible to realize the infinitely variable amplitude of the super-lifting radius according to the space and performance requirements. In addition, it is equipped with a high-power engine, four-wheel drive, and can move freely even in narrow venues.
Reprint from network